Iniciaste sesión como:
filler@godaddy.com
Iniciaste sesión como:
filler@godaddy.com
FMA identified unsupported Category 3 procedures, excessive demolition, equipment concerns, and overlapping charges. The submitted scope was reduced from $222,646.04 to $145,161.32, a savings of $77,484.72.
FMA identified stabilization lasting up to 31 days, unsupported environmental equipment, inadequate documentation, and overlapping charges. The supported mitigation scope was established at $174,373.27.
FMA corrected unsupported mitigation charges and scope inconsistencies associated with a Category 1 water loss. The contractor’s $40,771.83 estimate was reduced to $34,244.24, a savings of $6,527.59.
FMA identified unsupported equipment, Category 3 line items, documentation deficiencies, and pricing discrepancies. The contractor’s $16,606.82 estimate was reduced to $11,037.51, a savings of $5,569.31.
© 2026 Forensic Mitigation Analytics. All Rights Reserved.
Independent forensic mitigation consulting and technical analysis services. Opinions are based upon documentation reviewed and applicable industry standards. Submission of information through this website does not establish a consulting relationship.